Metropolitan Transportation Authority (MTA)
Metropolitan Transportation Authority (MTA) is named on 2 of the New York projects Constructel tracks by hand: Second Avenue Subway Phase 2, Interborough Express (IBX). Every role below is taken from the linked source for that project.
- Tracked Projects
- 2
- Landmark Infrastructure
- 2
- Firms Worked Alongside
- 7
NYC Projects
- Second Avenue Subway Phase 2Landmark Infrastructure
Under construction — utility relocation and early civil work; heavy tunneling targeted to start 2027 · $6.99 billion, per the Governor's office
RoleOwner / sponsoring agency
Source → - Interborough Express (IBX)Landmark Infrastructure
In environmental review and preliminary design — no construction start date announced · $5.5 billion total project cost, of which $2.75 billion (50%) is funded in the MTA's 2025-2029 Capital Plan. A separate $432 million is budgeted for train cars.
RoleOwner / sponsoring agency
Source →
Worked Alongside
Firms named on the same tracked projects — JV partners, the design team, the owner.
- FCC ConstructionContractor & Construction Manager
1 shared: Second Avenue Subway Phase 2
- Halmar InternationalContractor & Construction Manager
1 shared: Second Avenue Subway Phase 2
- HDRArchitecture & Engineering
1 shared: Interborough Express (IBX)
- JacobsArchitecture & Engineering
1 shared: Interborough Express (IBX)
- Skanska USAContractor & Construction Manager
1 shared: Second Avenue Subway Phase 2
- Traylor Bros.Contractor & Construction Manager
1 shared: Second Avenue Subway Phase 2
- Walsh ConstructionContractor & Construction Manager
1 shared: Second Avenue Subway Phase 2
Public agencies build through hired contractors, and agency-owned infrastructure generally sits outside standard NYC DOB permitting — so an agency's own name rarely appears as a DOB permit holder. Search live city records for "Metropolitan Transportation Authority (MTA)" →