Tuesday, September 15, 2026
Constructel NYCBeta

New York Construction & Development Intelligence

CONSTRUCTEL NYC TRACKS NYC DEPARTMENT OF BUILDINGS FILINGS, PERMITS & SKYSCRAPER PROJECTS CITYWIDECONSTRUCTEL NYC TRACKS NYC DEPARTMENT OF BUILDINGS FILINGS, PERMITS & SKYSCRAPER PROJECTS CITYWIDE
Cost Estimation

EstimAId

Cost estimation grounded in real data. The predictive product below is still Coming Soon — but the fourteen calculators further down are live today, using fixed published formulas, not AI.

How EstimAId Will Work

Grounded in real, comparable project data for a given type, borough, scale, and scope — not a generic industry multiplier. Still being built out against real data before it ships, not a detail we're filling in later. It'll stay unbuilt rather than ship estimate-only guidance dressed up as a cost prediction.

Available Today

Calculators

Not AI

These fourteen tools use fixed, published formulas and real rate tables — no machine learning, no prediction model. They're planning aids, not a substitute for a GC's, lender's, or expediter's own estimate.

Retainage Calculator

Contract sum × retainage rate. NY caps private contracts of $150,000+ at 5% (GBL §756-a).

Retainage Withheld

$125,000

Interest Reserve Calculator

Loan amount × 50% average draw utilization × annual rate × (term ÷ 12) — a standard rough-planning assumption, not a lender's actual draw-weighted calculation.

Estimated Interest Reserve

$637,500

Prevailing Wage Labor Cost Calculator

Workers × hours × (wage rate + supplemental benefit rate), per trade — NYC Comptroller's published prevailing wage schedule for public-work contracts.

Total Labor Cost

$144,931

Rate Used (Local #40 & #361)

$58.95/hr + $92.02/hr supplement

DOB Permit Filing Fee Estimator

Base fee for the first $3,000 of construction cost, plus $10.30 per $1,000 above that — DOB's own construction-cost-based formula, by building type.

Estimated Base Filing Fee

$5,399

Covers the construction-cost-based base fee for General Construction, Plumbing, Sprinkler, Standpipe, Mechanical, Structural, Support of Excavation, and Protection & Mechanical filings only — not a complete fee determination. DOB Job Application Filings can carry additional fees (other permit types, plan examination, amendments) this doesn't estimate, and the excess portion may round to DOB's own nearest-$1,000 convention rather than this calculator's continuous formula. Source: NYC DOB Service Notice, effective 2/2/2026.

Cost Per Square Foot Calculator

Total project cost ÷ gross square footage — the standard, simplest cost-density metric for comparing projects of different sizes.

Cost Per Square Foot

$375.00/SF

For Context: Turner Building Cost Index

1552 (Q2 2026, +5.15% YoY)

No NYC-specific $/SF benchmark exists in public data to compare this figure against — DOB doesn't report square footage alongside filed cost — so the index above is national directional context (is the market heating up or cooling down), not a NYC-normed target range.

Development Cost & Contingency Calculator

Hard cost, plus GC fee, contingency, and soft costs each as a % of hard cost — a standard planning rule of thumb for an early-stage total development cost, not a substitute for a line-item pro forma.

GC Fee

$1,500,000

Contingency

$3,000,000

Soft Costs

$6,000,000

Total Estimated Development Cost

$40,500,000

Stories ⇄ Height Estimator

Loading the live citywide average ft/story from DOB filings…

Estimated Height

240 ft

Material Price Escalation Calculator

Budgeted amount × (current PPI index ÷ index 6 months ago) — grounded in real national material price trends, not a generic inflation rate.

Equivalent Cost Today

$567,207

Change Since Budgeted

+$67,207

If you haven't bought it yet — buying in Oct 2026

$589,833 – $599,356

Your $500,000 budget carried all the way to a buyout in Oct 2026: today's $567,207 equivalent, escalated again by an 80% prediction band around a straight line fit through Steel's last 6 reported months (midpoint $594,594). This is arithmetic, not a forecast — no tariffs, plant outages, or freight disruptions are in it, and prices routinely break from a straight line. Budget the top of the band as escalation contingency rather than the midpoint as a price; run three months back on this same series, the identical method came out 1.9% high.

National trend, not an NYC-specific or per-supplier figure — see the methodology on Materials Pricing for what this index does and doesn't represent.

NYC & NYS Real Estate Transfer Tax Calculator

NYC RPTT + NYS Transfer Tax (both seller-paid) and, for residential deals $1M+, the NYS Mansion Tax (buyer-paid) — real published rate schedules, cliff-based (the full price is taxed at the bracket rate, not just the amount above it).

Seller: NYC RPTT + NYS Transfer Tax

$45,625

RPTT $35,625 (1.425%) + NYS $10,000

Buyer: NYS Mansion Tax

$31,250

1.25% bracket

A planning estimate, not a closing statement — real deals can carry exemptions, credits, or additional local fees. Verify with a real estate attorney or title company before relying on this for a closing.

Buildable Floor Area (FAR) Calculator

Lot area × maximum Floor Area Ratio — the standard NYC zoning formula for how much floor area a site can legally build. FAR is set per zoning district by NYC's own Zoning Resolution, not a fixed number, so it's an input here, not assumed — look yours up on ZoLa, the City Planning's own zoning map.

Maximum Buildable Floor Area

60,200 SF

A zoning-envelope ceiling, not a guarantee — actual buildable area can be reduced further by height limits, setbacks, yard requirements, parking, and mechanical/exempt-area rules that this formula alone doesn't capture.

Labor Hours Estimator

Labor budget ÷ (wage rate + supplemental benefit rate), per trade — then that total labor-hour figure spread across a crew size and workday length to estimate a real schedule length, not just a raw hour count.

Total Labor-Hours

1,656

Estimated Duration (6-person crew)

34.5 work-days (6.9 wks)

Assumes this trade works continuously at full crew size with no downtime (weather, inspections, material delays, other trades blocking access) — a real schedule almost always runs longer than this pure labor-hour math alone.

Concrete Volume Calculator

Slab or footing volume in cubic yards, the unit concrete is actually ordered in. Thickness is entered in inches because that is how slabs are specified; the conversion to feet and then to cubic yards (27 cubic feet each) is the arithmetic people most often get wrong on site.

Net Volume

18.52 cy

Order With Waste

20.37 cy

Geometry only. It assumes a uniform thickness over a rectangle — it does not account for thickened edges, haunches, drops, rebar displacement, or subgrade that isn't level, all of which move a real pour.

Yield on Cost & Development Spread

Stabilised NOI divided by all-in development cost, compared against the cap rate the finished building would actually trade at. The gap between the two — the development spread, quoted in basis points — is the return for taking construction risk rather than simply buying an existing building.

Yield on Cost

6.77%

Spread Over Market Cap

+152 bps

Value on Completion

$80,000,000

A negative spread means the building is worth less finished than it cost to build at these inputs. Nothing here is forecast: NOI, cost and cap rate are all yours, and a real deal's cap rate at completion is unknown while it is being built — that uncertainty is the risk the spread is meant to pay for.

Loan-to-Cost & Equity Requirement

How much of a project a construction lender will fund, and therefore how much equity has to be found before anything gets built. LTC is the lender's own term and varies by sponsor, asset type and cycle, so it is an input here rather than a number assumed for you.

Loan Amount

$37,200,000

Equity Required

$24,800,000

Loan-to-cost, not loan-to-value — a lender typically sizes to the lower of the two, so a deal can clear this test and still be constrained by an appraisal. Interest carried during construction is itself usually part of total cost; see the Interest Reserve calculator above.

Frequently Asked Questions

Are these NYC construction calculators free?
Yes — every calculator on this page runs entirely in your browser, needs no account, and sends nothing anywhere. Each one uses a fixed, published formula rather than a model, so the same inputs always give the same answer.
How do you calculate retainage on a NYC construction contract?
Retainage is a percentage of each payment application withheld until the work is accepted. The calculator applies your retainage percentage to the contract sum and to work completed to date, so you can see both the amount held and the amount actually payable now.
How much concrete do I need for a slab?
Multiply length by width by thickness, converting thickness from inches to feet, then divide by 27 to get cubic yards — the unit concrete is ordered in. The Concrete Volume calculator does that conversion and adds a waste factor you set yourself.
What is yield on cost, and what spread do developers look for?
Yield on cost is stabilised NOI divided by all-in development cost. Comparing it to the cap rate the finished building would trade at gives the development spread, quoted in basis points — the return for taking construction risk instead of buying an existing building. The target spread is a judgement that varies by sponsor, asset type and cycle, so this page asks for your cap rate rather than assuming one.
Do these tools use AI?
No. Despite the name, nothing here is a prediction model — they are fixed published formulas and real rate tables, including the NYC Comptroller's own prevailing wage schedule. Anything that would require forecasting is left as an input for you to supply.

Prevailing wage rates: NYC Comptroller's Schedule of Prevailing Wage Rates for Construction Workers, fetched 2026-08-10. See Wages for the full table.