Perimeter Bridge & Scaffold
Perimeter Bridge & Scaffold is the permittee on 2,304 permits in NYC Department of Buildings Permit Issuance records, issued between 1998 and Oct 31, 2008, 65% of them in Manhattan.
Compiled from 7 public recordsChecked Sep 25, 2026Sources & method
Filed with DOB under 19 spellings
Merged into one profile after normalizing punctuation, legal suffixes, common abbreviations and DOB's fixed-width name truncation. Spellings that could be a different business are never merged.
- PERIMETER BRIDGE & SCAFFOLD · 1,760
- PERIMETER BRIDGE AND SCAFFOLD · 186
- PERIMETER BRIDGE & SCAFFOLD CO I · 140
- PERIMETER BRIDGE & SCAFFOLD CO · 116
- PERIMETER BRIDGE&SCAFFOLD · 26
- PERIMETER BRIDGE & SCAFFOLD CO. · 18
- PERIMETER BRIDGE &SCAFFOLD · 12
- PERIMETER BRIDGE& SCAFFOLD · 10
- PERIMETER BRIDGE & SCAFFOLD CO., · 9
- PERIMETER BRIDGE & SCAFFOLD · 8
- PERIMETER BRIDGE & SCAFFOLD INC · 5
- PERIMETER BRIDGE & SCAFFOLD · 4
- Active Permitsi
- 0
- Permits On File
- 2,304
- Boroughs Active
- All five boroughs
- First Activity
- Aug 31, 1998
- Last Activity
- Oct 31, 2008
- Phone on Filei
- (516) 678-1977
Leadership
No executive publicly disclosed by the company or reputable press that we could verify. NYC's public DOB/DOS records don't include company officers or ownership at all, so we only show a name here when the company's own site or a named press source discloses one directly — most small subcontractors don't publish one anywhere findable. See Official Record Lookups below to search yourself.
Locations
Job-site addresses from this company's own DOB permit filings — no headquarters address is publicly disclosed by Perimeter Bridge & Scaffold that we could verify.
Licensed Professionals of Record(1)
The individual license holders DOB has on file as pulling permits under this business name — a second, permit-level real "key employee" data point NYC's public records provide, alongside Leadership above.
- Perimeter Bridge And ScaffoldGC · License #0009285
Current Permits
Unexpired permits in DOB's older Permit Issuance records, which most new work no longer goes through.
No unexpired permits in the older Permit Issuance records.
Recent Permit History(10)
- 267 West 45th St., ManhattanJul 3, 2008
EQ permit · Issued · 3 stories · Est. —
- 2 East 67 Street, ManhattanJun 19, 2008
EQ permit · Issued · 13 stories · Est. —
- 1 Sutton Place South, ManhattanJun 16, 2008
EQ permit · Issued · 13 stories · Est. —
- 397 West 12 Street, ManhattanJun 16, 2008
EQ permit · Issued · 10 stories · Est. —
- 397 West 12 Street, ManhattanMay 14, 2008
EQ permit · Issued · 10 stories · Est. —
- 21 East 33 Street, ManhattanApr 23, 2008
EQ permit · Issued · 5 stories · Est. —
- 441 East 57 Street, ManhattanApr 9, 2008
EQ permit · Issued · 5 stories · Est. —
- 309 East 56 Street, ManhattanApr 1, 2008
EQ permit · Issued · 4 stories · Est. —
- 135 West 41 Street, ManhattanJan 17, 2007
EQ permit · · 29 stories · Est. —
- 24 East 21 Street, ManhattanJan 2, 2007
EQ permit · Issued · 9 stories · Est. —
Developers & Owners Worked With(8)
From DOB's own owner-of-record field on each notable job's filing, above — ranked by how many of Perimeter Bridge & Scaffold's own projects that owner appears on. A real, sourced client relationship, not an inferred one.
- Far West Village Partners Llc2 projects
- Tri Beach Holding Llc1 project
- Fifth & 67th Inc1 project
- Sutton Place South Corporation1 project
- Nmp-group Llc1 project
- 441 E.57 St. Llc C/o Flank1 project
- Fbi C/o G.h Industries1 project
- Sama Llp1 project
Other Contractors on the Same Projects(1)
Other real companies that pulled a permit on one of Perimeter Bridge & Scaffold's own DOB job numbers, above — a genuine, sourced co-occurrence (same job application on file at DOB), not a confirmed formal GC/subcontractor relationship, which NYC's public permit data doesn't record at all.
- Perimeter Bridge & Scaffo3 shared jobs
EQ permit(s)
NYC Contract Awards Won
Cross-referenced against the city's own "Recent Contract Awards" dataset by vendor name — a DOB permit-pulling contractor and a procurement-awarded vendor are two different city record systems, joined here by an exact match after normalizing punctuation, legal suffixes, and common abbreviations. A real business can legitimately win contracts under a slightly different legal name than the one on its DOB permits, so an empty result here doesn't mean Perimeter Bridge & Scaffold has never won a city contract — only that no exact name match was found.
No exact name match found in NYC's awarded-contracts records. Browse Contract Awards →
Public Safety & Compliance Records(93)
These are citywide building-equipment compliance filings (including elevator and boiler safety compliance), ECB violations, and DOB complaints recorded at the same addresses as this company's projects above — not violations or complaints attributed to or caused by Perimeter Bridge & Scaffold. NYC's public data does not link any of these records to specific contractors (ECB violations in particular are almost always filed against the property owner), so no company safety score is shown or implied.
- DOB SafetyAEUHAZ · FTC-AEU-HAZDismissed · 2026-08-31
- ECB ViolationCLASS - 1 · BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP— · 2026-07-23
- DOB Complaint91 · DOB-assigned complaint category code, not independently decoded.Closed · 2026-07-23
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2026-05-20
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2026-05-20
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-11-14
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-11-14
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-11-14
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-11-14
- DOB SafetyGas Piping - LL152 · FTF-PL-PERActive · 2025-10-31
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2025-09-26
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-06-17
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-06-17
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-03-28
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2025-03-28
- DOB Complaint7K · DOB-assigned complaint category code, not independently decoded.Closed · 2025-03-13
- DOB Complaint78 · DOB-assigned complaint category code, not independently decoded.Closed · 2025-01-28
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2024-12-10
- DOB SafetyElevators · FTC-VT-CAT1-NJDismissed · 2024-10-11
- DOB Complaint2Y · DOB-assigned complaint category code, not independently decoded.Closed · 2024-09-03
- DOB SafetyFacades · FISPHAZActive · 2024-08-14
- ECB ViolationCLASS - 1 · 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCESIn Violation · 2024-08-13
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2024-07-15
- DOB SafetyRetro-Commissioning - LL87 · FTF-EN-EARCXActive · 2024-06-23
- DOB SafetyRetro-Commissioning - LL87 · FTF-EN-EARCXDismissed · 2024-06-23
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2024-03-25
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2024-03-25
- DOB SafetyFacades · FISPNRFActive · 2024-02-22
- DOB SafetyFacades · FISPNRFActive · 2024-02-22
- DOB SafetyElevators · FTC-VT-CAT1-NJDismissed · 2023-10-23
- DOB SafetyElevators · FTC-VT-CAT1-NJDismissed · 2023-10-23
- DOB SafetyElevators · FTC-VT-CAT1-NJDismissed · 2023-10-23
- DOB SafetyElevators · FTC-VT-CAT1-CODismissed · 2023-10-23
- DOB SafetyElevators · FTC-VT-CAT1-CODismissed · 2023-10-23
- DOB SafetyElevators · FTC-VT-CAT1-CODismissed · 2023-10-23
- DOB Complaint85 · DOB-assigned complaint category code, not independently decoded.Closed · 2023-10-21
- DOB SafetyElevators · FTC-VT-PER-CODismissed · 2023-10-02
- DOB Complaint7G · DOB-assigned complaint category code, not independently decoded.Closed · 2023-09-12
- DOB Complaint6V · DOB-assigned complaint category code, not independently decoded.Closed · 2023-09-05
- DOB Complaint7K · DOB-assigned complaint category code, not independently decoded.Closed · 2023-08-08
- DOB Complaint7K · DOB-assigned complaint category code, not independently decoded.Closed · 2023-08-08
- Boiler ComplianceInitial · DOB NOW: Safety Boiler filing — no defects noted on inspection.Accepted · 2023-07-28
- DOB Complaint6V · DOB-assigned complaint category code, not independently decoded.Closed · 2023-07-06
- DOB Complaint6V · DOB-assigned complaint category code, not independently decoded.Closed · 2023-07-06
- DOB Complaint7K · DOB-assigned complaint category code, not independently decoded.Closed · 2023-07-05
- DOB SafetyBoiler · LBLVIOActive · 2023-06-30
- DOB Complaint6V · DOB-assigned complaint category code, not independently decoded.Closed · 2023-04-26
- DOB Complaint78 · DOB-assigned complaint category code, not independently decoded.Closed · 2022-12-09
- ECB ViolationCLASS - 2 · ZR 11-62 VIOLATION OF DISCRETIONARY ZR CONDITIONS PRIVATELY OWNED PUBLIC SPACEIn Violation · 2021-05-17
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-10-09
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-09-16
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-02-19
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-02-19
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-02-19
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2020-02-19
- ECB ViolationCLASS - 2 · 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMENStipulation/in-vio · 2019-07-08
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2019-05-01
- DOB Complaint30 · DOB-assigned complaint category code, not independently decoded.Closed · 2019-02-20
- ECB ViolationCLASS - 2 · ZR 11-62 VIOLATION OF DISCRETIONARY ZR CONDITIONS PRIVATELY OWNED PUBLIC SPACEIn Violation · 2018-12-10
- DOB Complaint78 · DOB-assigned complaint category code, not independently decoded.Closed · 2018-11-16
- ECB ViolationCLASS - 2 · 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCESIn Violation · 2018-10-16
- DOB Complaint91 · DOB-assigned complaint category code, not independently decoded.Closed · 2018-07-24
- DOB Complaint78 · DOB-assigned complaint category code, not independently decoded.Closed · 2018-07-03
- ECB ViolationCLASS - 1 · 28-211.1 FILED CERT/FORM/APPLICATION/ETC CONTAINING A MATERIAL FALSE STATEMENTIn Violation · 2017-12-06
- ECB ViolationCLASS - 2 · 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMENCured/in-vio · 2017-12-06
- ECB ViolationCLASS - 2 · BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONSIn Violation · 2017-07-27
- ECB ViolationCLASS - 2 · 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTSWritten Off · 2017-07-27
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2017-06-21
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 2017-05-11
- Elevator ComplianceConveyor · DOB NOW: Elevator Safety Compliance filing status for device Conveyor at this address.Active · 2017-02-27
- Elevator CompliancePersonnel Hoist · DOB NOW: Elevator Safety Compliance filing status for device Personnel Hoist at this address.Removed · 2015-07-17
- Elevator CompliancePersonnel Hoist · DOB NOW: Elevator Safety Compliance filing status for device Personnel Hoist at this address.Removed · 2015-07-17
- ECB ViolationCLASS - 1 · 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONSIn Violation · 2015-06-03
- ECB ViolationCLASS - 2 · 28-104.2.2 FAIL TO PROVIDE APPRV/ACCEPTED PLANS ST JOB SITE AT TIME OF INSPCured/in-vio · 2012-06-13
- ECB ViolationCLASS - 2 · 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTSCured/in-vio · 2012-06-13
- ECB ViolationCLASS - 1 · BC 3316.2 & BC 3319.1 INADEQUATE SAFETY MEASURES: OPERATION OF CRANE/ DERRICK/HOISTING EQUIPIn Violation · 2012-06-13
- DOB Complaint4B · DOB-assigned complaint category code, not independently decoded.Closed · 2012-05-25
- DOB SafetyBoiler · LBLVIOActive · 2011-12-13
- ECB ViolationCLASS - 1 · 28-118.2 NEW BLDG OR LOT OCCUPIED W/O A VALID C OF ODismissed · 2011-01-19
- Elevator CompliancePersonnel Hoist · DOB NOW: Elevator Safety Compliance filing status for device Personnel Hoist at this address.Dismantled · 2010-07-06
- DOB Complaint23 · DOB-assigned complaint category code, not independently decoded.Closed · 2010-06-10
- ECB ViolationCLASS - 1 · BC 3314.4.3.1 (2008 CODE), 27-1045(B) & BC 3314.4.3.4 (2014 CODE) NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED BY AUTHOIn Violation · 2010-06-09
- ECB ViolationCLASS - 2 · 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONSIn Violation · 2010-06-09
- ECB ViolationCLASS - 1 · 28-118.2 NEW BLDG OR LOT OCCUPIED W/O A VALID C OF OIn Violation · 2010-06-07
- ECB ViolationCLASS - 1 · 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPMEIn Violation · 2008-09-30
- DOB Complaint59 · DOB-assigned complaint category code, not independently decoded.Closed · 2008-09-04
- ECB ViolationCLASS - 1 · 28-105.1 WORK WITHOUT A PERMITDefault · 2008-07-16
- DOB Complaint45 · DOB-assigned complaint category code, not independently decoded.Closed · 2007-05-03
- DOB Complaint53 · DOB-assigned complaint category code, not independently decoded.Closed · 1999-05-07
- DOB Complaint05 · DOB-assigned complaint category code, not independently decoded.Closed · 1994-03-03
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 1992-02-18
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 1988-07-11
- Elevator ComplianceElevator · DOB NOW: Elevator Safety Compliance filing status for device Elevator at this address.Active · 1988-07-11
Stop Work Orders(0)
DOB Stop Work Orders issued at this company's project addresses. A minority reference a job number in their text — when that job number matches one of Perimeter Bridge & Scaffold's own permits, it's marked directly linked below. The rest are address-level only (same building, different or unspecified job) and are shown as context, not attributed to this company.
No Stop Work Orders on record at these addresses.
Layoff & Closure Notices (WARN)(0)
Matched by business name against NYS DOL's official WARN Dashboard (layoffs/closures affecting 50+ employees). This is an approximate name match, not verified — WARN notices are filed under whatever legal entity operated the site, which can be a parent company, subsidiary, or DBA different from the name on a DOB permit. Confirm at the source link below before treating a match as confirmed. As of 2026-08-04, no NYC-area construction company appeared on the current WARN list — an empty result here is the norm, not a bug.
No matching WARN notices on file for this business name.
Companies Ranked Near Perimeter Bridge & Scaffold
Citywide, by permits on file with NYC DOB. This measures volume, not quality. Ranking counts cover each firm's main spellings, so they can sit below the all-spellings total quoted above.
- #141Nucor Construction Corp1,800
- #142Procida Construction Corp1,785
- #143Singla Concepts Inc1,766
- #144Perimeter Bridge & Scaffold1,760
- #145Reliable Fire Prot. Inc1,757
- #146Hunter Roberts Const. Grp1,754
- #147T&s Home Improvement Inc1,752
About Perimeter Bridge & Scaffold: Common Questions
- How many NYC building permits does Perimeter Bridge & Scaffold have?
- Perimeter Bridge & Scaffold is the permittee on 2,304 permits in NYC Department of Buildings Permit Issuance records, issued between 1998 and Oct 31, 2008, 65% of them in Manhattan.
- Which boroughs does Perimeter Bridge & Scaffold work in?
- By permits on file with the NYC Department of Buildings: Manhattan (1,495), Brooklyn (493), Bronx (167), Queens (146) and Staten Island (3).
Official Record Lookups
For company ownership, executives, or safety-inspection history beyond what DOB publishes, search the primary government sources directly:
- NY Dept. of State — Corporation & Business Entity Search
Official state registration record — registered agent, entity status, and filing history.
- OSHA Establishment Search
Federal workplace-safety inspection and citation history, searchable by company name.
- NYS DOL WARN Dashboard
Official statewide layoff/closure notice filings (WARN Act), searchable by employer.
- Better Business Bureau — Search This Company
BBB accreditation status, customer rating, and complaint history, pre-searched by this company's name near New York, NY.
Sources & Method
Every figure on this profile comes from the records below, read live on Sep 25, 2026. DOB spellings of a business name are merged only after normalizing punctuation, legal suffixes, common abbreviations and DOB's fixed-width truncation; spellings that could belong to a different business stay separate. Constructel publishes no quality ratings or composite scores for companies — the rank shown is permit volume and nothing else. Every dataset this site uses →
- [1]DOB Permit Issuance — NYC Department of Buildings
- [2]Recent Contract Awards — NYC Mayor's Office of Contract Services
- [3]DOB Safety Violations — NYC Department of Buildings
- [4]DOB ECB Violations — NYC Department of Buildings / Environmental Control Board
- [5]DOB Complaints Received — NYC Department of Buildings
- [6]Stop Work Orders in NYC — NYC Department of Buildings
- [7]WARN Dashboard — NYS Department of Labor
Cite this profile
Constructel NYC. "Perimeter Bridge & Scaffold — NYC Permits, Projects & Licenses." Data retrieved September 25, 2026. https://constructelnyc.com/companies/perimeter-bridge-and-scaffold