Installation Of Temporary Heavy Duty Sidewalk Shed For Remedial Repairs As Per Plans. No Change In Use, Egress Or Occupancy.sidewalk Shed Shall Comply With Chapter #33 Of The NYC Building Code. No Storage Permitted On Sidewalk Shed. Live Load 300 Psf.
Live from DOB Permit Issuance, cross-referenced by this job number — the business actually pulling the permit, not necessarily the filing applicant above.